We had our PCI today. Took close to 3 hours but nothing major spotted. Mainly touch-ups for paint, and 1 minor issue with a missing data point. Our driveway will be poured on either Saturday or Monday and our letterbox will be installed after that.
We've been given a handover date of Wednesday the 24th of April.
Nick and Bel's Building Adventure
A blog that tracks our building process with Wisdom Homes in Georges Fair from the purchase of the land until handover of the completed home.
Thursday, 18 April 2013
Sunday, 7 April 2013
Tiling completed. Final coat of paint started.
Went for a visit this morning to see that the painters were there doing the final coat. Tiling has also been completed. That just leaves our carpets, rendering of the front pier and driveway to go.
Saturday, 30 March 2013
Paint and fit-outs
Our house has received its first coat of paints and the electrical fit-outs are 99% complete. Toilets and basins have also been installed.
Main bedroom
Eave edges painted
Outdoor light
Can see our alarm panel
View from back lounge
Kitchen (rangehood installed too)
Hot water system
Benchtop (unsure of colours now that we've seen it)
Kitchen Downlights (window reflection ruining image)
Power point and network point
Kitchen sink
Where the NBN will live